QraOne Platform

Module: Design Control

DESIGN CONTROL CAPABILITIES
1

From requirements to release

Connect design inputs, requirements, outputs, verification, validation and release activities within a structured design control process.

This helps teams maintain visibility of development progress and the evidence supporting key design decisions.

2

Requirements, risk and evidence stay connected

Keep requirements, design outputs, risk controls and relevant verification or validation evidence linked throughout development.

This supports clearer impact assessment, stronger lifecycle traceability and more efficient preparation for design reviews, audits and regulatory submissions.

3

Design reviews and product realisation

Maintain design review records and supporting evidence throughout development, including design transfer and release activities where applicable.

This helps preserve continuity from development through to product realisation.

4

Reduce repetitive documentation work

QraOne can assist teams in preparing design control and supporting technical documentation using information already captured within the development process.

This reduces repetitive administrative work while keeping review and approval with the responsible team.

5

Work with your existing development tools

Where relevant, QraOne integrates with tools such as Jira, GitLab and GitHub, helping engineering teams maintain development evidence without unnecessary duplicate recording.

6

Lifecycle traceability

Maintain a connected view across requirements, risks, verification, validation, reviews and release activities.

This gives quality, regulatory and engineering teams clearer visibility of the design history and supporting evidence throughout the product lifecycle.